-
Regional Project Architect
Parfum Christian Dior Orient FZCO
Dubai, United Arab Emirates
Dec 2014 - Present (9 years 11 months)
Project Architect.
-
Construction Engineer / Technical Head / 3D visualiser
KPM ME
Jun 2013 - Nov 2014 (1 year 5 months)
-
Retail Interior designer
3d studio designing
Feb 2010 - May 2013 (3 years 3 months)
To produce new concepts for POSM.
To produce technical details for retail outlets.
To handle the production and fabrication for the same with timeline provided.
To install the same at required timeline.
-
Stand Designer
Chanel
Feb 2009 - Feb 2010 (1 year)
To produce new concepts for the new outlets opening.
To produce the technical details.
To coordinate with production manufacturer for the outlet fabrication.
To coordinate with merchandising team.
To coordinate with outlet for the installation of luxurious outlets.
-
Retail Interior Designer
Elegant Industries
May 2006 - Jan 2009 (2 years 8 months)
To produce technical details for luxurious perfumes and cosmetics brands.
To handle the factory production for the same.
To handle the installation process and handle the same with installation.
-
Interior Designer
Reza Kabul Architect
Jan 2005 - Apr 2006 (1 year 3 months)
To design complete residential or commercial projects