Hull School of Art and Design Year 3 - River Hull Corridor Masterplan
The images shown are a collection from my final comprehensive project for my BA(hons) architecture degree. The work focuses on the east bank of the river hull, and a regeneration scheme that seeks to enhance the immediate area whilst enabling the surrounding communities to develop and integrate into the new city-centre park-scape
The two individual projects both involved new build designs as part of the course requirements. The first project, tram and waterboat interchange involved the housing of a control centre for both transport networks alongside ticket offices, locker spaces, waiting rooms and café’s/shops.
The second semester project, Rank Foundation, was intended to act as an end event at the end of a new parkscape and also a landmark within the river corridor post industrial park.
The design offers an alternative to existing plans for the site, which propose the demolition and redevelopment of one of the cities most iconic and historic structures.