This was City's first SAE Baja Project where we designed and built an ATV abiding to SAE Rulebook.
Chassis ready with all other installations before the assembly of the exterior sheet metal body work.
Aviation style Gear system ( Lever moving up to increase the gear and moving down to decrease)
Pre-coat of Varnish before the Paint.
Car ready for a test drive.
Car Launch after all the testing.
gLike
SAE Baja Project - 2011-12
This was City's first SAE Baja Project where we designed and built an ATV abiding to SAE Rulebook.