-
Deputy Manager - Design
Magick Woods Limited
Mar 2012 - Present (12 years 8 months)
Product Design and Development.
Design Research, User study
-
Head creative design
??????, TN
Apr 2015 - May 2020 (5 years 1 month)
-
Assistant Manager-Design
Nilkamal Limited, Mumbai
Oct 2011 - May 2012 (7 months)
Industrial Design (furniture) , Design Management
-
Industrial Designer
ICS, Mumbai
Oct 2010 - Oct 2011 (1 year)
Designed a fan Assisted Mosquito repellent machine,
An Aesthetically beautiful and ergonimically viable Mosquito repellent body spray bottle for GODREJ.
Proposed designs of tamper evident cap for ESSEL PACKAGING
-
Freelancer
Mudes
Jun 2010 - Dec 2010 (6 months)
Designed a Low cost Electric Chimney.
Developed LOGO and Wedsite for an NGO aadaranavidya.org
-
intern
utc
2009 - 2009
Creating Brand Identity, by changing the AESTHETICS of the outer wrapper.
-
Engineer
GE
Jan 2008 - Aug 2008 (7 months)
As a quality assurance engineer, I carried out Testing HMI (Human Machine Interface) of Electric relays
-
Assistant Manager and Project Engineer
ACME Telepower Ltd
Jun 2005 - Dec 2007 (2 years 6 months)
Assistant Manager ( Projects - AP) -
Monitoring Installation testing and Commissioning of Telecom Shelter
Preparing the Daily project MIS of Telecom installations of Andhra Pradesh.
Vendor Development.
Project Engineer:
carring out Installation, Testing and commissioning of PIU (Power interface Unit) and DG of telecom shelters in Hyderabad cluster
-
Engineer
suresh powertech
Dec 2003 - Dec 2004 (1 year)
site engineer, for electrical installations