-
Senior Property Workplace Analyst
HoC
London, United Kingdom
Apr 2019 - Present (5 years 8 months)
Leading on proactive workplace management strategies, property performance analytics for the estate and property evaluation and project brief defining.
-
Senior Architect / Design lead
Beaumont Offices
London, United Kingdom
May 2017 - Present (7 years 7 months)
High End office fit out projects in City / Mayfair area working for developer / client. I was involved in various office space planning schemes, producing concept workplace designs and strategy in order to maximize flexibility of space, FF&E design intent ,schedules and detail drawings, material design research and sourcing, material quantities and costing, carrying out surveying with record information, client brief, client scope of works, snagging prior to taking occupation of building, working as a site architect dealing with site ongoing site enquiries, working in close relationship with sales team and producing sales layouts and strategy for tenants/clients, allocating tasks to junior team members
-
Senior Project Architect
ESA
London, United Kingdom
Apr 2012 - May 2017 (5 years 1 month)
Working on Large Scale Commercial projects from pre planning to practical completion (budget up to 18.5 million); My role consisted of managing team of up to 3 people, coordinating with other consultants design (M&E, structural, BREEAM, etc), coordination of consultant design, approval of drawings, overlooking packages done by the team, detail design, GA’s and fire drawings, involvement in client, consultant meeting, liaising with project managers, discharging building regulation conditions, tender process and tender interviews, post tender value engineering process, site and design team meetings, inspections, snagging, various consultant meetings
-
Project Architect; Architect on contract bases
M.M.M Design limited
London, United Kingdom
Apr 2009 - Mar 2012 (2 years 11 months)
Working as a Project Architect; Architect on contract bases for: Allies and Morrison, Gensler, Populous, Aedas, Rogers Stirk Harbour, KPF I had a chance to get involved in a wide range of projects, of different sectors, scales, and stages, including Olympics for Allies and Morrison,Plymouth Argyle Stadium for Populous and Canary Riverside (office) for Rogers Stirk Harbour + Partners. Working within complex existing constraints, I was responsible for managing design stage of Olympics retail area in preparation for planning application and in further stages and I was responsible for stadium internal layout design including planning and production of internal layouts in accordance to client’s brief, FIFA standards and relevant regulations. I was working on detail design. I have been in constant liaison with mechanical, structural, transport, fire, inclusive design, sustainability, etc. consultants. I have been working closely with all different clients’ bodies, project managers, contractors, subcontractors and suppliers. I was attending/ chairing all the relevant meetings, taking & distributing minutes, issuing and checking various information
-
Package Architect
Veretec (Aukett Fitzroy Robinson)
London, United Kingdom
Mar 2008 - Mar 2009 (1 year)
I was managing complex packages on Bury St. Edmunds (mixed use development) Angel Building (commercial) projects. I was responsible for detail design of the packages and coordination with external consultants, contractors design managers, concept architect and progression of complicated detail design issues. I was involved in regular meetings with concept architects, contractor, engineers, suppliers and subcontractors and going on site visits/meetings
-
Architect
Arup Sport
London, United Kingdom
Sep 2006 - Apr 2007 (7 months)
Working on Singapore Sports Hub - stadium internal layout design