-
Inner for Architecture and Interior Design
-
junior Urban Planner
D / Abdel Bake Ibrahim
* Main Projects: 1- Preplanning and development of the Industry city in Abu Rawash. Value of Project: 2 million EP Responsibilities: - Participate with team work in urban, social and visual survey. - Participate in a team work in the planning of the industrial city south of Aswan. * Company : General Authority for Urban Planning - Housing ministry - Egypt
-
Executive Manager
Inner for Architecture and Interior Design- Egypt
* Main Projects: 1- Development the Layout of pharmaceutical factory- Giza Value of Project: 1 million EB IV Medhat Soror Responsibilities: - Lead the team work to make details of drawing. - Follow up the implementation of in the site. 2- Development the Layout of some buildings in Cairo - Esmaelih Road Value of Project: 2 million EB Responsibilities: - Lead the team work to make shop drawing. - Follow up the implementation of the site. * Company
-
Al Othem for Contractor- Qassim - Saudi Arabia
Main Projects
* Executive Manager 1 - Implementation of the Housing compound. Value of Project: 5 million SAR Responsibilities: - Lead the team work to make shop drawings. - Follow up the implementation of the site. 2- Implementation of the Main Hospital 100 Beds. Value of Project: 12 million SAR Responsibilities: - Lead the team work to make shop drawings. - Follow up the implementation of the site. * Company
-
Senior Urban Planner
General Authority for Urban Planning - Housing Ministry
* Company Zuhair Fayez Partners Shape Saudi Arabia (from 2004 until now) * Senior Urban Planner * Main Projects: 1- Participate in a team work in the preparation of the Guidelines of the villages of Medina Al Munwarah Value of Project: 7 million SAR Responsibilities: - Make main Coordination with all of Team works in (Riyadh - Jeddah - Medina) & client to developing the planning. - Lead the team work based in Medina. 2- Participate in a team work in the update Master plan for the of Taif city. Value of Project: 9 million SAR Responsibilities: - Lead the survey Team works - Make a good analysis and make Main Alternatives. - Write the technical existing report (Urbanism - Facilities) 3- Participate in a team work in the construction and operation of the
-
Value of Project
National Urban
Observatory, United States
3.5 million SAR Responsibilities: - Participation of team work as urban development and preparation of studies relating to indicators of housing and infrastructure, utilities, transport, traffic and tenure. 4- Participate in a team work in the preparation of the King Abdu Allah Housing in gezan city Master Plan & detailing planning of the project (many sites in gezan for urgent housing). Value of Project: 15 million SAR Responsibilities: - Participate in the preparation of the urban planning alternatives proposed. Study areas and sites of the proposed services to the project (land use). - Collect all of need data from stakeholder (gezan Municipality, water company, electrical company) - Follow-up to the relevant authorities to adopt the general plan of the project. II Medhat Soror 5- Participate in a team work in the preparation of the Master Plan & detailing planning of the Nasmat Al Riyadh project ( total area 300 hectares). Value of Project: 50 million SAR Responsibilities: - Participate in the preparation of the preliminary planning alternatives proposed. Study areas and sites of the proposed services to the project. - Collect all of need data from stakeholder (Riyadh Municipality, water company, electrical company) - Follow-up to the relevant authorities to adopt the general plan of the project. 6- supervising the implementation of the headquarters of marketing, sales and villas of the Model Attributes Riyadh Value of Project: 25 million SAR Responsibilities: - Make a check of the all urban planning drawings. - Supervising the landscape (soft & hard) and roads in site as a consultant urban planner. 7- Participate in a team work in preparation of the outline of the local province Joumum - Makah Almokramh (some time) Value of Project: 3.5 million SAR Responsibilities: - Lead the team of urban survey in Joumum city - Make contact with stakeholder. 8- Participate in ...
-
Urban Planner
Arabia
* Main Projects: 1- Planning and design of park Buraidah - Qassim Value of Project: 2 million SAR Responsibilities: - Participate with a team work of preparation the necessary adjustments for the final phase of the project. 2- Planning site owned company in Riyadh reconstruction Value of Project: 5 million SAR Responsibilities: - Participate in a team work in the preparation of analysis of the current situation and to participate in the development of perceptions of the proposed alternatives. 3- Planning and development of the Almorslat District (north of Riyadh) Value of Project: 2.5 million SAR Responsibilities: - Participate in a team work in the preparation of analysis of the current situation and to participate in the development of perceptions of the proposed alternatives.
-
Owner & executive Manager
Medhat Soror Partnership - Egypt
* Main Projects: 1- Residential-commercial - Administrative Officer (herding Plaza) Central hub - 6th of October City. Value of Project: 100000 EP Responsibilities: -Preparation all documents of design, shop drawing, BQ and tenders. 2- Residential buildings Value of Project: 2, 5 million EP Responsibilities: V Medhat Soror - Preparation the Design and shop drawings for a residential building consisting of ground floor + 5 floors frequently Seventh district - Nasr City - Cairo. - Preparation of drawings for a residential building consisting of basement + ground + 8 floors frequent Kassabguy - Munib - Giza. - Preparation of drawings for the commercial market Marwah - the first tourist village -6th of October City. * Company
-
Urban Planner
Giza Governorate - Egypt
* Main Projects: 1- Preplanning and development of the Industry city in Abu Rawash. Value of Project: 1 million EP Responsibilities: - Team leader and main player for prepare the primary studies and final documents. 2- Redevelopment of the South Munerah districts as a slum area in Giza partnership with the French Team works Value of Project: 2,5 million EP Responsibilities: - Supervision the all of documents and comments. - Participate with the team work in prepare the alternatives. 3- Planning the regional Oases in western desert in Giza. Value of Project: 1,5 million EP Responsibilities: - Team leader and main player for prepare the primary studies and final documents. 4- Urban design Residential area ( 1000000 m2) in the west of Giza. Value of Project: 1,5 million EP Responsibilities: - Team leader and main player for prepare the primary studies and final documents. 5- Urban design 26 July axis which link with Giza and 6 October city. Value of Project: 1 million EP Responsibilities: - Prepare the urban design drawing. - Participate with team work in urban, social and visual survey. 6- Urban design Residential area (750000 m2) in the north of Giza. Value of Project: 1 million EP Responsibilities: VI Medhat Soror - Team leader and main player for prepare the primary studies and final documents.. - Participate with team work in urban, social and visual survey. * Company : Planning and Architectural Studies Center - Egypt
-
Shape- Saudi Arabia
Zuhair Fayez Partners
-
Architects and Engineers
2004:Albeah - Planners
-
Al Othem for Contractor- Qassim
-
Owner of Private Office for Engineering
Inner for Architecture and Interior Design
Consultants (Architecture& planning) * 1994-1996:Giza Governorate
-
Albeah - Planners
Architects and Engineers - Saudi