-
Aug 2012 - Present (12 years 3 months)
-
Creative Project Manager
ISMACM
Jan 2012 - Present (12 years 10 months)
Project Manager in charge of creating optimal proposals for diverse clients with unique requirements. Working in such thing like the design of a baby monitoring system, a universal cargo truck bed, the mold for a toy, commercial and educational exhibitions.
-
Art Teacher
Aqui Diseño Art Camp
Jun 2012 - Jun 2012
Art teacher, encouraging students from ages 5 to 15 to engage life in a creative mind set using different tools like: drawing and painting.
-
Technical director & assistance art director
Exposición “La Primavera está de Moda con Glade”
Mar 2012 - Jun 2012 (3 months)
Technical director and assistant art director of the promotional exhibition “La Primavera está de Moda con Glade” for S.C. Johnson & Son, Inc. Glade Product line held at Plaza las Americas, Plaza Caribe, Las Catalinas Mall and Mayaguez Mall. In charge of all the design and construction aspects of the exhibition emphasizing in early detection and prevention of problems by means of an objective analysis.
-
CEO
De Aquí Creative Solutions
Jan 2010 - Jan 2012 (2 years)
Executive Director of the company responsible for diagnosing the existing culture and shape the company into a successful direction, evaluating, recruiting and developing members of the company through a trusted channel of communication that seeks to develop optimal results and values. Working on projects such as the Turabo Formula, which competed in May 2011 in the Formula SAE held in Detroit, Michigan, the design and construction of a working heart monitor prototype to be used by citizens of Ghana, Africa in neonates and the design of a ventilator fan for pandemics among others projects.
-
Technical director
Exposición “Nuestros Niños Primero”
Aug 2011 - Dec 2011 (4 months)
Technical director of the exhibition “Nuestros Niños Primeros-Obra Social de Maga Roselló” held in the Library Museum Governor Pedro Roselló, University of Turabo. Responsible for the technical direction between the various contractors always keeping good documentations practices to better facilitate the various parties in the development and construction process.