-
Mechanical Engineer
MDP Engineering Group
Denver, CO
Apr 2011 - Present (13 years 7 months)
Mechanical Engineer – HVAC & Plumbing
• Familiar with IMC, IBC, IECC, codes, and ASHRAE standards.
• Performed LEED Energy modeling using Carrier HAP.
• Designed new-construction projects; Multi-family, Mixed use, Hotels, LEED-NC
• Tenant-finish projects: Offices, Restaurants, LEED-CI
• Construction Administration duties such as: field observation reports, RFIs, and submittal reviews.
• Tenant finish recon work such as site surveys and as-built drawings.
• Contributed to Company Drafting Standards, and excel calculation forms.
• Work primarily done with AutoCAD, Excel, and Revit.
• Other software: Acrobat, Navisworks, Word, COMcheck, Sketchup, Photoshop, GoTo Meeting, Powerpoint
-
Estimator
Ceric, Inc
Aug 2006 - Jul 2007 (11 months)
Ceric was a turnkey design-build firm for brick manufacturing plants.
* Created estimates for components of brick manufacturing plants.
* Analyzed historic cost information to incorporate into future bids
* Built new calculation spreadsheets to aid in estimating process.
-
Project Engineer / Project Manager
Northwest Pipe Company
Feb 2005 - Aug 2006 (1 year 6 months)
NW Pipe is a manufacturer of large diameter welded steel pipe for use in municipal water pipelines. Projects range from 40 feet to several miles long. ($20K to $6M)
* Confer with customer, discuss deadlines, possible RFI’s, and review scope of the project.
* Propose time-saving or money-saving design options to the customer.
* Design Calculations, identify and order critical lead-time items.
* Produce Construction Documents for manufacture and installation.
* Submittals including pipeline layout, details, calculations, and material specifications.
* Customer support upon delivery of product.
* Maintain records for billing and if necessary, issue change orders.
* Created spreadsheets for saving time on routine procedures.
* Trained new employees.
Returned September 2007 through December 2007
-
General labor
Rockhill & Associates
May 2004 - Sep 2004 (4 months)
Performed foundation work, framing, masonry, tiling, painting, and light carpentry. rockhillandassociates.com
-
Graduate Teaching Assistant
University of Missouri-Columbia
Jan 2003 - May 2003 (4 months)
Taught Senior-level Engineering Lab
* Organized and directed student experiments.
* Graded student homework and lab reports, analyzing their knowledge of the process as well as their results.
-
Student Tech
University of Missouri - Energy Management Office
Aug 2000 - Aug 2002 (2 years)
* Drafted new layout and controller termination drawings for HVAC systems to be used in construction documents.
* Drafted AutoCAD layouts HVAC systems after inspecting them first-hand on site.
* Created a manual illustrating air-handler layouts and coverage zones of over 80 campus buildings. This enabled technicians to quickly address after-hours service calls.