-
Mechanical Designer
Brockville, Canada
Sep 2013 - Jun 2016 (2 years 9 months)
MACK Global Engineering is a project management and multi-disciplined engineering company offering services to the industrial sector. The company was founded in August 2010 and has provided services to a number of well-known blue chip companies.
Our team has experience with all aspects of project management, engineering and design to implement capital projects in a cost effective manner. We work closely with management, engineering and operations personnel to provide reliable engineering solutions from concept to on-going operation. Our team is focused in the field with a hands-on approach to obtain a deep understanding of our customer’s requirements. We believe a team based approach provides the best and most cost effective solutions in a timely fashion.
-
Mechanical Designer
Ottawa, Canada
Dec 2011 - Sep 2013 (1 year 9 months)
Primarily focused on product design and manufacturing support for portable solvent recycler for industrial applications
Focused on product development and establishing manufacturing procedures. Research of existing technologies and development for new applications accompanied by analysis and 3D modelling. Manufacturing required a thorough understanding of metal fabrication in order to determine the best design practices for forming, machining and a variety of welding procedures.
Developed products from initial conception through too product release and manufacturing
Designed suites of accessories for products currently on the market
Created product development guidelines tailored to our specific design field
-
Co-op Student
Ottawa, Canada
Apr 2010 - Jul 2010 (3 months)
Developed manufacturing fixtures and analysed product flow through a large manufacturing facility,
Designed and implemented manufacturing mechanisms and methods to enhance productivity on a large industrial production floor. Effective design required communication between product designers and unionized lined workers to ensure that designs encompassed input from all departments. Coordinated with suppliers to obtain prototype components as specified in technical drawings.
Developed Manufacturing jigs and preformed line optimization for the SMART Table
Developed required documentation for changes based on the requirements of ISO 9001