-
Mechanical Engineer
Franklin Park, IL
Jun 2012 - Present (12 years 6 months)
• Responsible for assisting the mechanical design for commercial equipment
• Supported team on new products by designing/creating small plastic parts, developing testing apparatus, testing prototype designs, etc.
• Lead ME on cross-functional team dealing with all console projects.
• Console projects focused on adding IPTV/WIFI/RFID to the product line, creating color variants of the consoles, and updating parts for end of life.
• Assisted on issues with existing product lines, creating/maintaining BoMs in oracle, and creating/revising drawings in Solidworks PDM vault.
-
Mechanical Engineer/Project Manager
Wheeling, IL
Oct 2010 - Jun 2012 (1 year 8 months)
• Supported private aerospace design firm focused on turnkey machinery, injection molding, and machine spindles.
• Participated in the development of prototype tooling, equipment and special modifications to existing instrumentation or machinery
• Design duties involve generating bid proposals, reverse engineering assemblies, creating design documentation and specifications for mechanical and electro mechanical components and assemblies designed in house
• Other duties include ordering/purchasing mechanical components, generating Bill of Material, creating and maintaining Engineering Change Notices (ECNs) for all designs
• Project Management duties include coordinating vendor schedules, planning production/assembly schedules, reviewing drawings, and maintaining project Gantt Charts, tracking project costs, coordinating with customers and vendors
• Increased proficiency in 3-D modeling in Solidworks and 2-D modeling in AutoCAD
• Internal auditor for AS 9100 Revision C
-
Engineering Analyst
Detroit, MI
Apr 2010 - Sep 2010 (5 months)
• Created job process sheets for new tools supplied by GS&S at GM plants
• Trained on new tools by manufacturers that were used to measure height, depth, roughness, etc
• Used job process sheets/training to teach Warren and Toledo Transmission Plant’s Quality Team Leaders to use new equipment
• Responsible for creating preventative maintenance and certification schedules
-
Digital Factory Intern
Wayne, MI
May 2008 - Aug 2008 (3 months)
• Created and validated digital factory model of Wayne Stamping and Assembly Plant
• Established bill of resources for the final assembly department at WSAP
• Translated plant structure into Team Center product life cycle database
• Gathered/Created CAD data for tools and plant layouts