-
Architectural Consulting
Independent Consulting
Jun 2011 - Present (13 years 5 months)
Just completed design and documents for new retail & restaurant space at major airport that is starting construction in the Spring 2014. I am also starting work on a LEED Silver new learning center with support and accessory buildings for government body.
Past Projects: Renovation of vacation house; Design and Construction Management Services for 1800 sq ft luxury condo renovation in Atlanta; Ongoing architectural design services for colonial vacation home in Mexico; BIM Standards and Template for new architectural startup firm that included standard typical interior details; Technical support for commercial interiors space; Electrical Lighting Survey and Upgrades for High Rise Building
-
Senior Project Architect
Flad Architects
Dec 2008 - Jun 2010 (1 year 6 months)
SKIN SURGERY CENTER, WINSTON-SALEM, N.C.
Responsible for the detailing of shell and lobby of two-story outpatient healthcare facility; Building envelope included ventilated fiber cement panel rainscreen system, field stone veneer and aluminum storefront framing on structural steel & timber framing.
CONNECTICUT DEPT OF PUBLIC HEALTH NEW STATE LAB, ROCKY HILL, CT
Work in CD phase of new $62 million dollar, 106,000 sq ft Public Health Laboratory on 22-existing antiquated building in Connecticut. I was responsible for space planning changes that resolved some program issues and was commended by the client. I led in the detailing of a high performing façade and envelope in the goal for an energy efficient building.
-
Senior Level Project Architect, Associate
HOK
Dec 2006 - Nov 2008 (1 year 11 months)
Led design and production efforts on two new science Georgian-style buildings for Auburn University’s department of mechanical engineering and visiting research scientists totaling 146,000 sq ft. and $54 million dollars. Spaces included government secure labs and class 100/1000 clean rooms. I received HOK certificate of appreciation for outstanding effort and represented the Atlanta office in setting Best Practice standards for all of HOK.
-
Project Architect
Perkins+Will
Sep 2005 - Nov 2006 (1 year 2 months)
Project Architect for shell and core for $128 million dollar 160,000 sq ft national bio-containment laboratory in Fort Detrick, MD. I successfully collaborated with the interiors group in the design of a 4-story lobby and with a remote office on the detailing of the façade. Building met federal physical security requirements including blast resistance and control of biohazards.
-
Project Architect
Holabird & Root
Dec 1996 - Mar 2005 (8 years 3 months)
Project Architect responsible for the planning, coordination, accuracy and production effort on new and gutted facilities for Higher Education including STEM centers, libraries, and a residential dorm. Clients included Augsburg College, University of Evansville, City Colleges of Chicago Harold Washington College, Loras College, Eastern Illinois University, University of Chicago International House, American Dental Association