RFR Samurai 200
Operations to this new project, to be summed in this way:
• changing position of the shipowner flat from the main deck to the upper deck and placing the shipowner cabin from bow to stern;
• placing of a gym and wellness in the main deck;
• placing of an open dining room at bow;
• pool with fall system from the upper deck to the main one and from the main deck to the small bath beach;
• obtaining a sun deck with profile hidden;
• settlement and setting up the kitchen and control cabn;
• installation of high efficiency photovoltaic panels on the small roof beside the bridge (adjacent to the heliport), for a total area of 78 square meters, in a way to reduce drastically the use of generators when the boat is cast with anchor;
• evocative for the first meta design phase was the world of architecture with the house above waterfall by F. L. Wright as much as the car and bike design with references and looking back at the 70's especially.
Design: R.Delle Donne-F.Merzari-R.Pennazzi (2009)