Pontoon dredger (Time Duration - 1.5 month)
Fabrication of Structure, assembly and Performance testing
1. Fabrication of Pontoon boxes and Soap bubble testing of boxes.
2. Fabrication of structures( 3 structure).
3. Assembly of pontoons structure with Dredger pump.
4. Performance testing.
Pontoons are used by the dredging industry as heavy-duty work platforms.The dredger pump is designed to take in sediment and debris from the surface floor into a suction pipe, carrying the material to a discharge site through a pipeline.