IADT Orlando Consolidation Project 1st Floor Test Fit A - Test fit A was one of the options provided to reconfigure space and plan out expansion space at the International Academy of Design & Technology Orlando's current location. The school was planning to consolidate two buildings into one to streamline their space and services.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_320955_qkDZsx39MAQ__jcDHQ92xLpkh.jpg)
IADT Orlando 2nd Floor Consolidation Project Test Fit A - Test fit A was one of the options provided to reconfigure space and plan out expansion space at the International Academy of Design & Technology Orlando's current location. The school was planning to consolidate two buildings into one to streamline their space and services.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_320955_Ze0wPQEiFeeSF50hR5nC2DslF.jpg)
IADT Orlando Consolidation Project 1st Floor Test Fit B - Test fit B was one of the options provided to reconfigure space and plan out expansion space at the International Academy of Design & Technology Orlando's current location. The school was planning to consolidate two buildings into one to streamline their space and services.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_320955_XTY37HndlI6yEaHP6pSW8t1t8.jpg)
IADT Orlando Consolidation Plan 2nd Floor Test Fit B - Test fit B was one of the options provided to reconfigure space and plan out expansion space at the International Academy of Design & Technology Orlando's current location. The school was planning to consolidate two buildings into one to streamline their space and services.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_320955_6miRIS5LngTBW_MFCTY5rR8BQ.jpg)
IADT Orlando Consolidation Project Existing Conditions Verification - The existing plans were used to create key plans that corresponded to a worksheet. This was then sent to the school so they could verify each space's function, requirements, room name and number
View PDF