TEAGUE HOUSE
One of my first projects for an open-minded client. He hired me in 1989 and we completed construction in 1996 after 2 years of construction. The roof was so out of the box for local framers, so the General Contractor hired a boat builder friend of his to frame the multiple warped roofs. I loved this project. The main design criteria was to not cut any tree down that had a diameter of 8" or greater. We ended up with only one straight wall.
View Website