Trip to Martha's Vineyard on finished motorcycle.
Week 1
Installing parking break.
Front end removed
Original fusebox.
Improved fusebox, with LED indicators.
Spedometer working with backlights installed.
New oil pressure gauge, painted to match Spedometer.
Oil pressure gauge on new custom mount.
Removing Transmission
Inside Transmission, replacing broken gear and selector forks.
Original Valve Cover
Polished Valve Cover
With Enging Turning
Original Ignition Coil Cover.
Ingition Coil Cover, polished.
Ignition Coil Cover, with Engine Turning
Timing Gear Cover.
Detail View of Surface.
Polished Timing Gear Cover.
Final Drive.
Final Drive Cover, polished.
Carburetors, new and polished with engine turning.
Screwdriver/ allen wrench to adjust fuel mixture.
Finished screwdriver.
Engine Block with exposed Piston.
Cylinders and Headers painted.
Detail of finished Block with Alternator.
Motor, after polishing and paint.
Motor, after polishing and paint.
Motor, after polishing and paint.
gLike
Dnepr MT-11
David M
Project Engineer Boston, MA