Unpacking from the crate, brand new.
Tore down completely for the rebuild. Installing the table with new screws.
Motor mounts to hold the new stepper motors, replacing the hand wheels.
So much soldering! Connections for motor drives and limit switches.
Motors and electronics set out for construction.
Control box under construction. Power supply, switch, E-Stop and motor controller.
Box complete, minus the lid.
Completed mill ready for indicating and cutting.
gLike
Vertical Mill CNC Adaption

This was a CNC I created for my workshop from a LMS vertical mill. The lead screws were replaced for ball screws, motor mounts were attached for the stepper motors, and a control box was built for the power supply, limit switches, E-Stop and motor controller.