![](https://s3images.coroflot.com/user_files/individual_files/original_352402_GBzPKotVmYj8o7OKkn1clREpp.jpg)
EAGLE ACADEMY SHARED OFFICE floorplan
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_8a9r5wjV5LQhrDVhQ3jFLhkRE.jpg)
EAGLE ACADEMY SHARED OFFICE 3d view
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_J1HuUHN8UUKkOmnf3sd1Zj5z3.jpg)
EAGLE ACADEMY SHARED OFFICE aerial view
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_dnertxjDFpVuDy80TQGO1HVUX.jpg)
EAGLE ACADEMY SHARED OFFICE alternate view
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_YpD0tD4j64QBH24rmIIJB4KXq.jpg)
EAGLE ACADEMY SHARED OFFICE floorplan
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_1LwqqhphyWwrDif_Dmc_pNnms.jpg)
EAGLE ACADEMY SHARED OFFICE 3d view
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_1QjrMGglb8monkYqlnq2NgAFF.jpg)
EAGLE ACADEMY SHARED OFFICE birdseye view
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_P2nTfuWYyeUDWUeuBhmflbJPd.jpg)
EAGLE ACADEMY SHARED OFFICE alternate 3d view
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_aaXqeSwnbO_EZqvwLB52VXm1j.jpg)
EAGLE ACADEMY SHARED OFFICE
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_5RPUl8UB62DmCPGNSeldpUjTG.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN floor 1 - DESIGNING & FURNISHING THREE LEVELS OF THIS ELEMENTARY WAS FUN YET EXHAUSTING.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_S_a7pFu9_0AdsqZPxVz1lU7mL.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN floor 2 - DESIGNING & FURNISHING THREE LEVELS OF THIS ELEMENTARY WAS FUN YET EXHAUSTING.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_QR8sNycMDrvlLkgQnMKNYT1RB.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN floor 3 - THIS WAS AN IMMENSE PROJECT. DESIGNING THREE LEVELS OF A ELEMENTARY SCHOOL WAS CHALLENGING BUT FUN. WE MANAGED TO GET EVERYTHING DESIGNED AND PUT TOGETHER THE DAY BEFORE SCHOOL STARTED.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_f5p7KLPLnfW2_ZeRe9Y7liKYI.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN art room - THIS WAS AN IMMENSE PROJECT. DESIGNING THREE LEVELS OF A ELEMENTARY SCHOOL WAS CHALLENGING BUT FUN. WE MANAGED TO GET EVERYTHING DESIGNED AND PUT TOGETHER THE DAY BEFORE SCHOOL STARTED.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_WeYc8loTxBtIXXuJWpawu8U3P.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN conference room - THIS WAS AN IMMENSE PROJECT. DESIGNING THREE LEVELS OF A ELEMENTARY SCHOOL WAS CHALLENGING BUT FUN. WE MANAGED TO GET EVERYTHING DESIGNED AND PUT TOGETHER THE DAY BEFORE SCHOOL STARTED.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_5EDv2SZzeOdSY_5Z40o_EUZiE.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN main office - THIS WAS AN IMMENSE PROJECT. DESIGNING THREE LEVELS OF A ELEMENTARY SCHOOL WAS CHALLENGING BUT FUN. WE MANAGED TO GET EVERYTHING DESIGNED AND PUT TOGETHER THE DAY BEFORE SCHOOL STARTED.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_LrZrAKWBsP_o7ehgpkqEXmVCo.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN - THIS WAS AN IMMENSE PROJECT. DESIGNING THREE LEVELS OF A ELEMENTARY SCHOOL WAS CHALLENGING BUT FUN. WE MANAGED TO GET EVERYTHING DESIGNED AND PUT TOGETHER THE DAY BEFORE SCHOOL STARTED.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_ml2xcHUeWtybk7vEg41JZMU_P.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN computer room - THIS WAS AN IMMENSE PROJECT. DESIGNING THREE LEVELS OF A ELEMENTARY SCHOOL WAS CHALLENGING BUT FUN. WE MANAGED TO GET EVERYTHING DESIGNED AND PUT TOGETHER THE DAY BEFORE SCHOOL STARTED.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_p840rov8din1hUoEQKMRRjBGJ.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN office design - DESIGNING & FURNISHING THREE LEVELS OF THIS ELEMENTARY WAS FUN YET EXHAUSTING.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_G9pX6b1bKqiZUP3eFMiHcmILF.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN workroom ot/pt - DESIGNING & FURNISHING THREE LEVELS OF THIS ELEMENTARY WAS FUN YET EXHAUSTING.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_4JoZowlaJwN0fzFjadE8bC2WI.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN business admin. - DESIGNING & FURNISHING THREE LEVELS OF THIS ELEMENTARY WAS FUN YET EXHAUSTING.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_EgIy9_PjpHqnmJLmeTpivdk3r.jpg)
TYLER ELEMENTARY waiting room - DESIGNING & FURNISHING THREE LEVELS OF THIS ELEMENTARY WAS FUN YET EXHAUSTING.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_Aw7cggH8KR4oYGRQaih1vdRc1.jpg)
TYLER ELEMENTARY(3) parent resource room - DESIGNING & FURNISHING THREE LEVELS OF AN ELEMENTARY SCHOOL WAS FUN YET EXHAUSTING.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_gaYFCOAVOILXrUKCNdwX7Qs4r.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN teacher lounge - DESIGNING & FURNISHING THREE LEVELS OF AN ELEMENTARY SCHOOL WAS FUN YET EXHAUSTING.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_gV67vOz6Hbi3GTsY4GBhbyKox.jpg)
TYLER ELEMENTARY(3) FLOOR DESIGN teacher lounge - DESIGNING & FURNISHING THREE LEVELS OF AN ELEMENTARY SCHOOL WAS FUN YET EXHAUSTING.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/352402_u3gHuzQg9D8dNYAZYHWCtkyfM.jpg)
INSTALLATION PICTURES OF SCHOOL FURNITURE - AFTER ALL THE DESIGN WAS COMPLETE, THE FURNITURE WAS ORDERED AND INSTALLED. PICTURES SAY IT ALL!
![](https://s3images.coroflot.com/user_files/individual_files/352402_u_9Nt8pVMWV5w9uNuts3MMD4T.jpg)
INSTALLATION PICTURES OF SCHOOL FURNITURE - AFTER ALL THE DESIGN WAS COMPLETE, THE FURNITURE WAS ORDERED AND INSTALLED. PICTURES SAY IT ALL!
![](https://s3images.coroflot.com/user_files/individual_files/352402_b_J2MiWbKzUlx4fDvQ19UtN4y.jpg)
INSTALLATION PICTURES OF SCHOOL FURNITURE - AFTER ALL THE DESIGN WAS COMPLETE, THE FURNITURE WAS ORDERED AND INSTALLED. PICTURES SAY IT ALL!
![](https://s3images.coroflot.com/user_files/individual_files/352402_m9XZq9IIn2VEa02Hni1d8hHH_.jpg)
INSTALLATION PICTURES OF SCHOOL FURNITURE - AFTER ALL THE DESIGN WAS COMPLETE, THE FURNITURE WAS ORDERED AND INSTALLED. PICTURES SAY IT ALL!
![](https://s3images.coroflot.com/user_files/individual_files/352402_8ygqenG4CW31iHCVhId3dq21c.jpg)
INSTALLATION PICTURES OF SCHOOL FURNITURE - AFTER ALL THE DESIGN WAS COMPLETE, THE FURNITURE WAS ORDERED AND INSTALLED. PICTURES SAY IT ALL!
![](https://s3images.coroflot.com/user_files/individual_files/352402_JwnUFPnWJxF0gKwuKuqXXEKrT.jpg)
INSTALLATION PICTURES OF SCHOOL FURNITURE - AFTER ALL THE DESIGN WAS COMPLETE, THE FURNITURE WAS ORDERED AND INSTALLED. PICTURES SAY IT ALL!
![](https://s3images.coroflot.com/user_files/individual_files/352402_JDMoWA4JU40tNo_JQv0jlMiiH.jpg)
INSTALLATION PICTURES OF SCHOOL FURNITURE - AFTER ALL THE DESIGN WAS COMPLETE, THE FURNITURE WAS ORDERED AND INSTALLED. PICTURES SAY IT ALL!
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_ApiwEQpADgcGhFFd1K8unOwkd.jpg)
NATIONAL PREP SCHOOL
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_rWRWbf4nkhq1dZmmqgSuEVJdN.jpg)
NATIONAL PREP SCHOOL
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_F3rov8cfC4fAy4wqnGXb_WXfz.jpg)
NATIONAL PREP SCHOOL
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_hbwuVrHoEbXrz4L09cqMd26OT.jpg)
NATIONAL PREP SCHOOL
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_INRqcHXNkweBAHucTvhN3uvZ8.jpg)
NATIONAL PREP SCHOOL
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_YdfK27mpSLhMBMF2G5XEp9J8j.jpg)
NATIONAL PREP SCHOOL
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_4T9N0rL1mf9AtrG_5RCKwY0qX.jpg)
NATIONAL PREP SCHOOL
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_F025cquxgsO1E0qwvAvaacas4.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_pNUatMI_M8gB5GWx2vNIWBceY.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_4zwnFE_XceLqkO9gqWgOvrCd7.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_tDXnmEZclE5wfAPcfCV5Rq8yi.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_aQaZxg7KvKk46wljAhffiJSc2.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_gcctErOJqaqGKJHJGSHNHA85i.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_7yshjTO7lpLXqrfXEZ_PE_lEc.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_MjZadBcT9O7_pqYROfjKrAiAB.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_mxUO6tEiYTrysYfa1OfHBLd0M.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_a2tiCFEpha7rvERIRJN4bixOn.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_GBHXccsS21tz5KuQZbzbuI9eT.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_JHwnSfafYSDtnOlVUnI_rQVEo.jpg)
NATIONAL PREP SCHOOL - DESIGNING EACH FLOOR OF THE SCHOOL TO ACCOMMODATE 25 KIDS PER CLASS. DESIGN EACH OFFICE FOR PRINCIPAL AND STAFF INCLUDING FRONT DESK GUARD.
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_9vN5ODe5LpgjOvwVgK69g2DJk.jpg)
WASHINGTON YU-YING PUBLIC CHARTER SCHOOL - THIS WAS THE FIRST PUBLIC SCHOOL TO OFFER CHINESE LANGUAGE IMMERSION. YU-YING COMBINES LANGUAGE IMMERSION WITH THE INQUIRY-BASED CURRICULA OF THE INTERNATIONAL BACCALAUREATE ORGANIZATION. DESINGN FOR 25 PRE-SCHOOL STUDENTS. 700 S.F. TOTAL
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_wvKewYgwFHglb48GpOOq6nmIJ.jpg)
WASHINGTON YU-YING PUBLIC CHARTER SCHOOL - THIS WAS THE FIRST PUBLIC SCHOOL TO OFFER CHINESE LANGUAGE IMMERSION. YU-YING COMBINES LANGUAGE IMMERSION WITH THE INQUIRY-BASED CURRICULA OF THE INTERNATIONAL BACCALAUREATE ORGANIZATION. DESINGN FOR 25 PRE-SCHOOL STUDENTS. 700 S.F. TOTAL
View PDF
View PDF
![](https://s3images.coroflot.com/user_files/individual_files/original_352402_eaxHFt7v0xkfE2n14FMswRVTI.jpg)
WASHINGTON YU-YING PUBLIC CHARTER SCHOOL - THIS WAS THE FIRST PUBLIC SCHOOL TO OFFER CHINESE LANGUAGE IMMERSION. YU-YING COMBINES LANGUAGE IMMERSION WITH THE INQUIRY-BASED CURRICULA OF THE INTERNATIONAL BACCALAUREATE ORGANIZATION. DESINGN FOR 25 PRE-SCHOOL STUDENTS. 700 S.F. TOTAL
View PDF
View PDF
gLike