I was the lead designer with H2L2 Architects and Planners for David Evans and Associates.
photo credits: Victor von Salza, Luke Olsen
Sauvie Island Bridge, Portland, OR: Multnomah County Bridges.
Completed June 2008
Lead Project Designer:
The design intent was a based on a local threatened butterfly species, the Oregon Silver Spot Butterfly. Bow Tied Arch with radial cabling, and custom tear drop penetrations on the bowtied arch.
Photo Credit: Victor von Salza
I was the lead designer with H2L2 Architects and Planners, David Evans Associates.
Photo Credit: Victor von Salza